Abstract

This paper reviewed the methods, which calculate the pull strength during directional drilling crossing construction of oil pipeline, both at home and aboard. And based on the analysis of these methods, the detailed research was given. At the same time, considering the peculiarity of this channel geologic structure and the technological requirements, the method, averaged standard method and unloading arch method, was given to calculate the maximal pull strength. It is practiced that, this method is instructive and meaningful to the directional drilling crossing construction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.