Abstract

Hybrid girder cable-stayed bridge has some advantages, such as structure mechanism performance and the low cost. In China, more and more cable-stayed bridge with hybrid girder appeared. The steel–concrete joint part is one of the key structures of large span cable-stayed bridge with hybrid girder, the static bearing capacity and fatigue performance of steel–concrete joint part structure is directly related to security and durability of the bridge. Through the finite element simulation calculation, the stress distribution is calculated, and the stress distribution of the steel structure top plate, steel structure baseplate, concrete top plate and concrete baseplate is analysed emphatically. Verify the bearing capacity and safety of the structural design of joint section.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.