Abstract

Segment floating is a common problem met in the construction of large-diameter crossing-river shield tunnel. The factors affecting segment floating are discussed first and analyzed by numerical simulation, including the properties of grouting material, the speed of shield tunneling, grouting pressure difference, the tunnel longitudinal stiffness, frictional force between segment rings and weight of the supporting system. The simulation results indicate that segment floating will reduce by shortening slurry’s initial solidification time, slowing shielding speed, improving the tunnel longitudinal stiffness as well as increasing the frictional force between segment rings. And some measures are given such as applying new rapid-setting slurries, shear pins, rubber mats with high friction coefficient and pre-stressed bolts

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.