Abstract

Based on the tunnel engineering of Xi’an metro, according to the specific geological conditions, used FLAC3D numerical simulation software, the paper determine the minimum supporting force of the excavation face by two monitoring points’ settlement as the standard. The point at the surface above the excavation face and the other at the top of excavation face. When buried depth of tunnel is greater than 1.5 times the diameter of hole, the surface point cannot effectively reflect the deformation of soil around the tunnel, it should monitor and control the deformation of soil by the top point. The paper determine the maximum supporting force of the excavation face by the analysis of the settlement at the top points in different buried depth of tunnel. Obtain the safety range of supporting force in shield machine excavation face. According to the surface uplift larger phenomenon in shallow tunnel, put forward corresponding countermeasure. It is of great significance to apply reasonable supporting force at excavation face and prevent the surface subsidence and uplift crossing the locations that tunnel depth have large changes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.