Abstract

Based on the study of some post-disaster reconstruction project examples and related policy documents,this article analyses the existing problems of the post-disaster reconstruction project engineering cost combining with the actual engineering projects of the post-Wenchuan earthquake reconstruction. Then it discusses the factors that affect the post-disaster reconstruction project engineering cost and puts forward some suggestions for it in the end. The study of this paper expects to provide some theoretical and practical references for the subsequent engineering practices, and hopes not only promoting the limited government post-disaster reconstruction special funds to realize their maximum utility, but also enhancing the whole level of our countries'reconstruction management and engineering cost control.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.