Abstract
Redundant time plays an important role in train rescheduling. Different types and different values of it will bring various results on train rescheduling. The research promoted a simulation method to analyse the impact of two types of redundant time - buffer time and recovery time - on train rescheduling by simulation. The simulation method and a train rescheduling algorithm were described firstly and the common train rescheduling strategies used in train rescheduling were analysed. Then Wuhan-Guangzhou high speed railway Wuguang HSR was taken as example for the simulation analysis and different values of buffer time and recovery time were set in the experiments. The different impact of redundant time on rescheduling was analysed from the simulation data and the suitable redundant time of Wuguang HSR was achieved finally.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Information and Communication Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.