Abstract
Baiyangdian wetland is the end of defence line to middlestream and downstream of Daqing river, and its geographic position has decided its critical function to flood control of Daqing river watershed. Therefore, according to the flood regulating ability of Baiyangdian, when the basin occur 50 year frequency flood, joint operation programs have been determined firstly, then the joint operation of Baiyangdian and multi-reservoir in parallel upstream have been presented through the pre-discharge regulation and real-time control discharge regulation, through comparison we determined the optimal combination scheme: joint scheduling with Wangkuai, Xidayang and Longmen upstream reservoirs,the storing water of reservoir can appropriately increased by reservoirs flood control capacity, thus we can not diversion flood to Wenanwa by Xiaoguan floodway, it can reduce the flood diversion of 1.62×109 m3; and compared with conventional scheduling, we can reduce 8.57×108 m3 flood diversion to the East wetland through Zaolinzhuang discharge gate. Therefore the flood flow into the flood diversion area reduced significantly, which have great practical significance to the safety of Baiyangdian wetlands surrounding areas and the important cities and towns downstream.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.