In order to understand the influence of 750 kV power transmission and transformation project on electromagnetic radiation of surrounding environment, the data of electric field intensity, magnetic field intensity and noise from 750 kV substation equipment transmission and transformation system in some areas of Gansu Province were monitored and analyzed. The results showed that the areas near circuit breaker, switch and reactance in the power transmission system were the main areas producing high electric field intensity. The electric field intensity near the circuit breaker is the highest in substation equipment, with the average value of 12.40 ± 1.25 kV/m, while the main noise producing area is near the reactor. The study could provide scientific basis for environmental assessment and prevention of ultrahigh voltage power transmission projects.