Abstract

Renewable energy like wind power has developed rapidly in recent years, however, cognition to wind power development in eastern and central China still has a lot of controversy. This paper focuses on issues of wind power resource potential in eastern and central China, and its influence to power planning and power system operation. Then, typical day operation of Shandong power grid and Hunan power grid has been simulated, and possibilities of wind power curtailment in some period of time are analysed. Through identifying tough power system operation period to different areas, guidance for power planning of these areas would be brought forward, in order to make better accommodation situation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call