Abstract
Start with bathing, washing, and cooking, and then move from these three activities to the parts of the human body, one of which is water. The need for clean water is increasing along with population growth. In this study, an analysis of the need for and availability of clean water was carried out in the service area of the Wae Mese I Water Treatment Plant (WTP), which covers seven urban villages in the Kecamatan Komodo. Projected water demand is based on population growth from 2021 to 2030. Projected water availability is based on the production capacity of WTP Wae Mese I from 2021 to 2030. Based on projected water demand and availability, water balance and WTP production capacity were analyzed in 2030.Based on the analysis of the results, the population in 2030 will reach 45715 people, and the total water demand in 2030 will be 62.06 liters/second. Meanwhile, the capacity of WTP Wae Mese I 40 liters/second has decreased to 33.81 liters/second in 2030. This results in a water deficit of 28.25 liters/second.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.