Abstract
The purpose of this study was to analyze the capacity of the reservoir to the change in land use around the Unnes campus. The research method used is the flood hydrograph routing method in the reservoir using the Storm Water Management Model (SWMM) program to obtain the maximum capacity of the reservoir flood discharge, after which a comparison of the planned flood discharge of the resevoir to the flood discharge in the existing conditions of the reservoir is carried out to assess the capacity of the Unnes reservoir against land use change. Based on the results of the study, it was found that there was a change in the bottom depth of the reservoir at the beginning of the planning was 4.00 meters and in the current condition it became 3.00 meters, which means that the capacity is reduced by 1.00 meters with the ability to pass the flood discharge inflow which is still adequate and there is no overflow of flood.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.