Abstract

The paper presents simulation results of transients during the power system restoration. The Defence plan and Restoration plan development is a part of transmission system operator’s responsibilities and requires thorough calculations, simulations and publication of instructions. The plans focus on extensive failures that have a heavy impact on the system operation and could lead to a blackout. The Restoration plan of power system has to contain procedures for start-up without outside help. TSO regularly checks some part of the Restoration plan.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call