Abstract

Project for the construction of the Gunungsari Banjar Sugihan - Kandangan diversion channel, Surabaya, in the implementation of this project there was a delay in how many works. One way to anticipate this delay is by accelerating it using the Time Cost Tread Off method, through alternative working hours (overtime) and additional labor. The method is used so that the project can run smoothly and so that the project can be accelerated in completion. Time-Cost Trade-Off analysis, better known as TCTO. jobs included in the critical cross and jobs that are not allowed to delay are as follows: Urugan Sirtu (solid), Lean concrete fc 10 Mpa work, Rigid pavement fc 30 Mpa work finishing growing, iron beginning work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.