Abstract

The purpose of this paper is to study the performance of an existing open cycle gas turbine power plant at Putrajaya power station. At compressor inlet temperature of 298.90K, thermal efficiency of 31 % was observed for the existing or current cycle whiles the modified configuration yielded thermal efficiency of 45 %, this result in 14 % increase in thermal efficiency. At pressure ratio of 3.67, thermal efficiency of about 31.06% and 44% was recorded for the current cycle and regenerative cycle respectively. The efficiency of both cycles increase considerably with increase in pressure ratio, but at pressure ratio of about 7, only a small increase in efficiency for both cycles was observed. The optimum value of the efficiencies for both cycles that correspond to pressure ratio of 7 is 43.06 and 56% for the current cycle and the regenerative cycle respectively.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.