Abstract

After years of operation, the plant will no longer operate optimally according to its design. The practice of the work cycle shows that the original value of thermal efficiency will always be below 100%, this is because during the cycle process of creating work, the energy received by the system by heat transfer will not be fully received and will be absorbed by the environment. In this research, thermal efficiency analysis was carried out in accordance with the first and second laws of thermodynamic efficiency and thermoeconomic calculations to calculate losses. Based on calculations that have been carried out, the thermal efficiency of the Star Energy Geothermal Darajat unit-3 geothermal power plant system is 21.72% with the largest exergy loss being in the condenser component of 62,219,418 kW with an exergy loss cost of 252,766,682.24 Rp/ days and the smallest is in the cooling tower of 599,362 kW with exergy loss costs of 23,655,907.11. Rp/day from the following results it can be seen that this efficiency value depends on the performance of each component.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.