Abstract

This paper presents a study concerning the transmission line uprating method by injection of third harmonic voltage (THV). The method has been recently employed as a more economically feasible proposal to raise the transmission voltage level without the requirement for changes in the structural elements of overhead lines. The superposition of a third harmonic voltage component with the fundamental component at the sending and receiving ends of the line increases the amplitude of the fundamental voltage component without exceeding the electrical insulation tolerance limits, which results in a rising of the power transfer capability. This workshows a study on the behavior of the voltage profile of several OHTLs, represented by Bergeron's model, which were uprated by the THV technique. The results have shown that THV technique is a feasible option for OHTLs of up to 200-km length. For OHTLs longer than 200 km, phase voltages may exceed safety levels which imposes a limitation in the uprating of the long lines by this technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.