Abstract
The joint demand for power and freshwater is continuously increasing due to population growth, the rise of economic activity, and climate change. Integrated concentrating solar thermal power and desalination (CSP+D) plants may provide a key solution for the pressing freshwater deficit and energy problems in many regions of the world. Simulation tools with an accurate prediction of the yearly electric energy and freshwater production are needed. This paper analyzed the influence of the time step in the annual simulation of a CSP+D plant composed of a seawater multi-effect distillation unit and a parabolic trough concentrating solar thermal power plant, considering the location of Tabernas (Spain). A dynamic simulation tool of this system was developed, implementing the models in Engineering Equation Solver. The annual electricity and water productions obtained for the study case considered were 154 GWh and 3.45 hm3, respectively, using 5 min time steps, and 94 GWh and 2.1 hm3, respectively, with 1 h time steps. The results obtained show that a short time step interval (5 min) is recommended when using the detailed CSP model considered, which is prepared for simulation with short time steps. Step times of 1 h lead to excessive errors (about 30% in summer and 100% in winter), which underestimate the actual production.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.