Abstract

The purpose of this research is to find out and analyze the procedure/mechanism of budgeting and the causes of the difference (variance) between the budget and the realization of operational costs that the PDAM of Donggala Regency has determined. The research method used is the descriptive analysis method and analysis of variance. The analysis of variance shows that in 2015 the total operating costs occurred unfavorable deviations with the percentage of -1.96%. In 2016 the total operational costs occurred unfavorable deviations with the percentage of -5.41%. In 2017 the total operational cost deviation occurred favorable with the percentage of 14.38%. In 2018 z total operating costs occurred deviations favorable with the percentage of 14.45%. In 2019 the total operational costs occurred deviation favorable with the percentage of 24.6%. Based on the analysis results that the deviations that occur between the budget and the realization of operational costs are still within the control limits, management can anticipate that the realization does not deviate far from the budget that has been set.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.