Abstract

Under the engineering background of end shaft construction in an underground two-story metro station, the change and development laws of supporting axial force, enclosure structural deformation and internal force during the end shaft excavation process were analyzed through the field measurement, and the measured values were statistically compared with the design values. The results indicate that it is very necessary to erect steel changing brace in the design, which exerts an unobvious effect on mitigating the enclosure structural deformation of the foundation pit in practical engineering, but apparently affects the axial force of adjacent steel braces in the steel changing brace. The results can be verified through the long-term monitoring at different points during the subsequent metro construction, and other steel changing brace forms convenient for the construction should be considered to substitute the conventional steel changing brace.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.