Abstract

In several manufacturing systems found in the automotive, food and semiconductor industries, product quality or value deterioration due to excessive residence time in the system are observed. This phenomenon generates defective or low value products, thus undermining the performance of these systems. In this paper, we develop an exact analytical method for calculating the lead time distribution of closed loop systems and present an heuristic to predict the peaks of this distribution. Numerical results show previously uninvestigated behavior of closed loop manufacturing systems under lead time constraints and provide insights on the design of these complex systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.