Abstract

The traditional bus bay stops are prone to ponding, with reduced waiting comfort, low traffic efficiency and easily damaged pavement structure. Given the problem, based on the sponge design of the bay stop in northern China, the rainstorm flood management model under the traditional and sponge modes is constructed, and the runoff condition of the bus stop is analyzed. The results show that the combination design of LID facilities, such as permeable pavement and the recessed green belt has a good control effect on rainwater runoff in the stop section. The larger the range of LID measures adopted in the stop section, the more pronounced the runoff control effect. The combined design of sponge facilities can effectively control rainwater runoff. However, with the increase in rainfall intensity, the control effect of sponge measures on rainwater runoff at the bus stop gradually decreases.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.