Abstract

The foundation pit of shield working well needs to meet the requirements of shield assembly, starting, and hoisting. The short-time load at the edge of the pit is frequent and the construction conditions are more complicated. This paper takes the foundation pit of a certain project in Jinan as the research background. Based on field measured data, based on theoretical analysis. The force and deformation laws of the underground diaphragm wall + internal bracing structure under short-term load are studied, and some conclusions can be used to guide the design and construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.