Abstract

In highway reconstruction and expansion projects, the impact of the abandoned dreg body produced by the original highway on the new bridge project cannot be ignored. If the abandoned dregs are not handled properly, they will cause great threat to the operation of the new highway as well as to the safety of the surrounding environment and personnel. In this paper, based on a South China highway reconstruction and expansion project, a model of the abandoned dreg body, bridge pile and anti-slide pile is established with the help of finite difference software FLAC3D 5.0. The calculation results show that compared with burying the anti-slide pile, slope cutting is more effective for improving the stability of the abandoned dreg body. Under the action of vertical force intensity, the displacement of the top of the pile increases continuously, and the maximum bending moment of the pile body increases firstly and then decreases. The pile displacement and bending moment of the bridge pile increase significantly in the storm condition compared with the normal condition. In addition, the abandoned dreg body hazard prevention and control technical measures are studied. The impacts of different locations of anti-slide pile burial on bridge piles are analyzed and compared, and it is determined that the optimal location of anti-slide pile burial is the middle of the secondary slope.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.