Abstract
The straight line concept which has developed as a practical design restriction in intertial surveys with the Litton System is not only cumbersome in the planning stage but also often affects the economy of the survey adversely. A more flexible use of the system is therefore desirable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have