Abstract

The paper represents the results of field measurements in the off-grid power system of oil field including diesel power plant, which supplies drilling rig system BU-4500/270 EK-BM. The data has been processed using the instantaneous power theory by Hirofumi Akagi. The active power load diagram of diesel power plant and power system frequency schedule have been obtained for hole drilling technological process of drilling rig. Abrupt load changes during drilling lead to large frequency deviations, which do not allow using gas piston generators in power system of oil field without revision of number and rated power of generators or using electrical energy storage system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.