Abstract
Abstract This paper analyses the mechanism for the failure of primary support of a deep-buried tunnel whose side wall collapses during construction. The main focus is on discussion and comparison of the soil engineering aspects of the incident, and on the lessons that may be learnt from the case. Empirical and numerical analysis have been carried out for the collapse. The mechanisms of failure of tunnel are analyzed during tunnel excavation and the parameters of support are revised according to the results of analysis. Results have shown that the collapse of tunnel is mainly attributed to abundant joint fissures on surrounding soil. The changed support makes tunnel drive through the section of collapse successfully, and similar dangerous situation does not take place in the following construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.