Abstract
According to national standards, water utilities have to guarantee the supply of water to their consumers in appropriate quality, quantity and pressure. Therefore, foresighted rehabilitation planning is necessary. In some cases the buried water supply system is more than 100 years old but still in use. The aging process of the material derived from failures can be noticed by the water utilities in the daily operation, where several factors influence the lifetime expectancy. It is nearly impossible to predict the first failure, but if a failure occurs caused by aging processes, the following failure can be described statistically. The decisions whether a pipe-section should stay in use and be repaired locally or be replaced can be supported by statistical analyses.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.