Abstract
The influence of the secondary arc on the power system is more and more serious with the rise of voltage levels. If the secondary arc can not be extinguished promptly, the single-phase auto-reclosing will fail. In order to reduce the secondary arc extinction time, there by ensuring the success of the single-phase auto-reclosing, Jindongnan-Nanyang-Jingmen UHV AC demonstration project is used as an example. This paper analyses the factors affecting the secondary arc current using PSCAD/EMTDC. The simulation results are coincident with the theoretical analysis. The conclusions drawn from this paper will be excellent references to the future UHV (ultra high voltage) projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.