Abstract
This paper focuses on a simulation-based experimental study of the effects of routing flexibility, sequencing flexibility and part sequencing rules on the performance of a typical Flexible Manufacturing System (FMS). Three Routing Flexibility Levels (RFLs), five Sequencing Flexibility Levels (SFLs) and four Part Sequencing Rules (PSRs) are considered for detailed investigation. A discrete-event simulation model is developed to describe the operation of the FMS. The performance of the FMS is evaluated using measures related to flow time and tardiness of parts. The statistical analysis of the simulation results reveals that there is a significant interaction among RFL, SFL and PSR for all the performance measures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.