Abstract

Introduction: The construction industry is characterized by many small companies working with limited resources and substandard safety management systems. The aim of this study: To analyze the costs of preventing work accidents in implementing the work health and safety management system in the arts and sports building construction project in Palopo City. This research uses the method: mixed qualitative and quantitative research with descriptive analysis research design. The selected samples in this research were project contractors, K3 experts and several workers who almost had work accidents. Results: The costs incurred by the company do not meet the requirements of the PUPR ministerial regulations in Circular Letter Number 11/SE/M/2019. Based on the analysis of tangible benefits, the total cost of treatment and the total cost of project delays is IDR 317,859,200. And based on the BCR analysis the results obtained are B/C ≥ 1 for the benefits realized.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.