Abstract

AbstractThe paper presents a static load test of a pile with the largest vertical load in Poland to-date up to the force of 23000 kN. The test was performed in the centre of Warsaw on the construction site of a future high-rise building to be the tallest building in European Union. The designed building height measured from the ground level is 310 meters including an 80-metre mast. The foundation of the building was designed as a Combined Piled Raft Foundation (CPRF) utilising the barrettes and diaphragm walls technology. The test was carried out on barrettes with lengths of approx. 28 and 34 m and was aimed to estimate the stiffness (load-settlement relation) of the designed 17.5 metre-long barrette situated below the foundation level. In addition to that a series of extensometric sensors was placed inside the barrette to determine the distribution of the axial force.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.