Abstract

This paper presents an analysis of core sampling and the effectiveness of using the BOSHP-100.02 ball hanger. The article compared and summarized the used ball suspensions that are used in UKR-185/100 and analyzed the economic aspects of the further use of this equipment in production. The tasks of increasing the efficiency of the ball suspension were analyzed. A comparative analysis of the use of hangers during core sampling was carried out. Calculated economic benefit in use.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.