Abstract

The deformation control of roadways surrounded by rock in the fully mechanized amplification sections of extra-thick coal seams is problematic. To analyze the failure and failure characteristics of a support frame, as well as the deformation and failure processes of the surrounding rock, through theoretical analysis and industrial tests, the deformation and support conditions of a return airway of a fully mechanized caving face in an extra-thick coal seam in the Yangchangwan Coal Mine, in the Ningdong mining, area were examined. Combined with limit equilibrium theory and roadway section size, the width of the coal pillar of the return air roadway at the 130,205 working face was calculated to be 6 m. The layout scheme and implementation parameters of roof blasting pressure relief, coal pillar grouting modification, and bolt (cable) support were designed. Based on the analysis, a “Coal pillar optimization–roof cutting destressing–routing modification–rock bolting” system for surrounding rock control in synergy with the fully enlarged section mining roadway in the extra-thick coal seam was proposed, and the deformation of the surrounding rock was monitored, along with the stress of the support body and the grouting effect on the site. Field experiments show that after the implementation of the surrounding rock control in synergy with the roadway, the maximum subsidence of the top plate was 55 mm, the maximum bottom heave of the bottom plate was 55 mm, the maximum values of the upper and lower side drums were 30 mm and 70 mm, respectively, and the breaking rate of the bolt (cable) and the deformation of the surrounding rock of the roadway was reduced by more than 90% and 70%, respectively. The effective performance of the coal pillar grouting was observed as well. Field practice of the roadway surrounding rock control in the synergy method indicated that rock deformation was effectively controlled, and the successful application of this technology was able to provide reliable technical and theoretical support for the Ningdong mining area and mines with similar conditions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call