Abstract
Research on Supply Flow Performance Management in the Bajawa People's Coffee Production System was carried out in Ngada Regency, with the aim of finding out the relationship between cooperation and the performance of the Bajawa coffee supply flow, knowing the relationship between information sharing and the supply flow performance of Bajawa coffee and knowing the long-term relationship with Bajawa coffee supply flow performance. Many factors can influence the performance of supply flow management in companies, including information sharing, long term relationships, and cooperation. The method used in this research is to analyze the relationship between the dependent variable (cooperation, information sharing and long-term relationships) and the independent variable (Bajawa coffee supply flow performance). From the results of the multiple linear regression analysis carried out, it shows that: the long-term relationship variable has the greatest influence on the Bajawa coffee SCM performance variable (dependent) with a coefficient value of (0.047), then the cooperation variable with a value of ( 0.019 ), and which has a The smallest influence is the information sharing variable (0.018). This means that the three independent variables have a positive and significant effect on the dependent variable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.