Abstract

This study aims to analyze the supply chain management performance of audio system products at CV. Create Bloom. Another objective is to find out the material flow, information flow, and product flow run by CV. Cipta Mekar. The research method used is descriptive qualitative, using purposive sampling technique. Data collection techniques in this study were observation, interviews and documentation. In addition, performance assessment is carried out using the Scor Model. The results showed that the material flow did not run properly. The flow of information with a circular communication pattern and the simultaneous dissemination of information did not go well. In the product flow there is a shortage of stock and there is no quality control process. The results of the Scor Model show that the daily inventory performance is not good. In this case, there are still many things that need to be improved in the supply chain management of audio system products on CV. Cipta Mekar.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.