Abstract

In order to improve the quality of the relevant construction development activities and effectively meet the special requirements of the design and construction of large span concrete bridges, the safety, effectiveness and economy of the bridge are fully enhanced. In this paper, the spatial structure of the long span concrete bridge is very special. As well as environmental adaptability, technical staff should be based on the development of large and span concrete bridge construction activities of the actual needs of large-span concrete bridge for scientific design and planning, but also the construction technology application activities for scientific supervision. The purpose of this paper is to explore the scientific and efficient application of stress monitoring in the construction process of large span concrete bridge under the guidance of the relevant theory of construction from the perspective of stress monitoring, so as to ensure the accuracy of construction activities and promote the development of bridge orderly development.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.