Abstract

Relying on an actual project, this paper carries out the application analysis and prediction research of the dam height 150m-200m concrete-faced rockfill dam on deep overburden. Through the finite element calculation results, the stress and deformation of the dam and the structural design of the seepage control system are analyzed. Several preliminary standards have been adopted to control its safety and provide a reasonable basis and technical support for the construction of a 150m-200m high dam on deep overburden.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call