Abstract

Construction operations productivity remains a challenge due to the influence of space limitations and construction methods. This condition was experienced by the construction of Pasundan University’s new campus building within a narrow and congested location. This research carried out a productivity evaluation on the steel beam installation based on Time Studies, MPDM, Work Sampling and 5-Minutes Rating. Productivity analysis uses the MPDM, Cycle Chart, Process and Crew Balance Chart. The evaluation of the overall productivity of steel beam installation operations shows a comparison of the percentage of work execution versus delay of 62% versus 38%. This result is quite good considering that the proportion of construction worker productivity is in the range of 40-70% compared to 62% on this project. Improvement of productivity can still be done by preventing delays due to equipment; efficiency of the number of workers; as well as optimizing the duration of each task by referring to the best cycle duration. Thus, the productivity can increase from 10.36 minutes/unit to 6.25 minutes/unit. It is hoped that these results will attract similar research with objects to produce productivity data on construction operations in Indonesia and encourage an improvement in the construction sector.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call