Abstract
The stability of soil sprayed on a steep rock slope is one of the key problems in greening. This paper analyses the stability of soil after shrub greening on a 70 degree steep slope in Luoyang. The calculation results show that the stability of soil will increases with the growth of root system after shrub greening. Field tests show that the soil stability of steep slope has been good after shrub growth for 2 years, which provides a reference of shrub greening design on steep rock slope.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.