Abstract
Using the monitoring data, an expression of ground settlement with associated coordinates above shield tunnel during construction was established, in which coefficients were obtained by the least square method. After transforming this expression into a standard form of elliptic umbilic catastrophe model, the instability criterion for the soil above shield tunnel was determined with the analysis of this model. Instability criterion values were thereafter obtained then the soil state would be judged according to these values. Three cases in different regions in China, referred to Bund Channel in Shanghai, metro line 1 in Chengdu City and metro line 4 in Beijing, were presented. They showed that the method developed in this paper was suitable in analyzing and forecasting the stabilities of soil above shield tunnels.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.