Abstract
The fundamental issues of extending the period between repairs for glass-melting tank furnaces are analyzed. Based on data obtained in studying refractory brickwork after the furnace has been stopped for a cold repair and analyzing the specifics of corrosion of refractories in various structural elements, technical solutions are proposed and implemented enabling one to extend the tank furnace campaign to 7–8 years.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.