Abstract

The master-slave paradigm finds important applications in many industrial settings. In the master-slave model considered in this paper a set of jobs is to be processed by a system of processors. Each job consists of a preprocessing task, a slave task and a postprocessing task that must be executed in this order. The pre- and postprocessing tasks are to be processed by a master processor, whereas the slave task is processed by a slave processor. We consider three different specifications for the relative order of pre- and postprocessing tasks; namely order preserving sequences, reverse order sequences, and sequences where no order constraint is imposed. For the problem of minimizing makespan in master-slave systems with multiple masters, we develop heuristic algorithms with good bounded performance, for all three order specifications. Our computational results indicate that the average performance of our heuristics is near optimal. Furthermore, we identify the production environment and workload characteristics that favor each order specification.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.