Abstract
In this paper, Multi-Microgrids (MMG) are considered as future smart distribution grids, in which small scale energy resources (SSER) are main power generation units with small scales. Optimal operation of microgrids in defined intervals is carried out to achieve economic conditions in distribution systems. The defined operating problem is optimized using a heuristic algorithm considering uncertainties in loads and renewable energy resources (RERs). The probability density functions (PDFs) are used to encounter with the uncertainties. The total cost of the network is minimized by the algorithm. Then, each MG is evaluated from reliability point of view. Some new introduced reliability indices in the literature for MGs are used to evaluate the MGs' reliability. In proposed structure, the MGs are in interconnected mode and there is power exchanging between MGs. The particle swarm optimization (PSO) algorithm is applied to optimal power dispatch and the obtained results are compared by Monte Carlo simulation (MCS) method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.