Abstract
In this paper, a flexible method of optimizing the velocity of plunger is presented by selecting important oil well production parameters through orthogonal test and combining the oil well parameters and the structural parameters of the pump barrel. In order to explore the influence of the motion rate of the optimized flexible plunger on the pump efficiency, the motion law curves of the plunger before and after the optimization were compared, and the pump efficiency before and after the optimization was theoretically analyzed. The flow rate and pump efficiency of the pump before and after optimization were simulated by the model. Finally, the pumping unit experimental system is used to test the pumping pump fluid production before and after optimization. The results show that the pump efficiency under the optimized flexible rate is 3.7% higher than that before the optimization without considering other factors. The model simulation analysis shows that the mass flow rate of the pump in a single swabbing period under the condition of optimized flexible rate is increased, and the pump efficiency is increased by 4.9% compared with that before optimization. The experimental results of the pumping unit experimental system show that the fluid yield under the optimized flexible rate is higher than that before the optimization, and the maximum increase is 4.1%. The experimental results are consistent with the theoretical analysis results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.