Abstract

The requirements concerning reliability in power supply are high. This paper treats the issue of system adequacy, i.e., there should be enough installed capacity to meet the load with an acceptable reliability. The challenge in a liberalized market is that the utilization time of rarely used peak units is so low that they require extremely high prices in order to be profitable. This has led to different methods, including the creation of capacity markets. The aim of this paper is to analyze the connection between peak prices, system reliability, required amount of subsidized capacity, i.e., the volume of the capacity market. In the studied market setup, only some selected units, so-called “reserve plants”, receive a capacity payment. The paper also provides an example concerning change of capacity market volume in presence of wind power.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.