Abstract

Pre-stressed concrete bridge analysis is completely dependent on the standards and design criteria. Herein, the current study compares like a pre-stressed concrete bridge under the effect of two different loading standards and specifications. The two different loading standards considered herein are IRC 6: 2000 and AASHTO-LRFD standards. Further, the pre-stressed box girder bridge is modelled and analysis in MIDAS CIVIL. On carrying out analysis, the primary structural analysis parameters which are important for the design of structure, are studied. These parameters are shear force, bending moment and torsion in the bridge elements along its length. It became observed that AASHTO standards are uneconomical than IRC standards, due to consideration of heavy weight vehicle load moving on the bridge span. Thus, it might be said that pre-stressed box girder bridge analysis and design should be carried out effectively and optimistically using IRC standards and specifications.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call