Abstract

This paper develops economic production quantity (EPQ)-based models with planned backorders to evaluate the impact of the postponement strategy on a manufacturer in a supply chain. We derive the optimal total average costs per unit time for producing and keeping n end-products in a postponement system and a non-postponement system, respectively. By comparing the optimal total average costs of the two systems, we evaluate the impact of postponement on the manufacturer under four circumstances. Our results show that postponement strategy can give a lower total average cost under certain circumstances. We also find that the key factors in postponement decisions are the variance of the machine utilization rates and the variance of the backorder costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.