Abstract
Distance relay protection is widely used worldwide for protection scheme on high voltage transmission lines. This protection tends to be prone to load encroachment condition causing possible undesired tripping condition. Investigations of two system disturbances that occurred in TNB’s (Tenaga Nasional Berhad) Grid in the year 2003 and 2005 have clearly revealed the occurrence of load encroachment condition following line overloads after large number of line tripping. Examination of the impedance locus trajectory during the overload events have enabled a distinction be made between power swing and load encroachment phenomena. This paper presents the analysis and findings of the investigation of the load encroachment phenomena of the two events, including other related transmission line contingencies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Power and Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.