Abstract

The relationships between unit numbers and capacities to be installed for microturbine cogeneration systems are analyzed from an economic viewpoint. In analyzing, an optimization approach is adopted. Namely, unit numbers and capacities are determined together with maximum contract demands of utilities such as electricity and natural gas so as to minimize the annual total cost in consideration of annual operational strategies corresponding to seasonal and hourly energy demand requirements. This optimization problem is formulated as a large-scale mixed-integer linear programming one. The suboptimal solution of this problem is obtained efficiently by solving several small-scale subproblems. Through numerical studies carried out on systems installed in hotels by changing the electrical generating/exhaust heat recovery efficiencies, the initial capital cost of the microturbine cogeneration unit and maximum energy demands as parameters, the influence of the parameters on the optimal numbers and capacities of the microturbine cogeneration units is clarified.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.