Abstract

For planning a build-operate-transfer (BOT) highway, a rigid contract between a government and private firms with fixed capacity and economic toll adjustment (ETA) provisions to traffic demand variations is practically adopted to cope with the risk caused by uncertain traffic demand. This study develops a two-stage stochastic programming model to determine its optimal highway capacity and ETA strategy, and deeply analyze some insightful properties of this type of contract. Finally, it is compared with two other “very rigid” single-stage BOT contracts with the fixed toll and capacity provisions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.